

RRL Marine completed a comprehensive Front-End Engineering Design (FEED) and feasibility study for a new LNG receiving terminal in Banten for PT Gas Indonesia. Our marine engineering team conducted detailed marine access assessment, navigation simulation, berthing analysis for 150,000 m³ LNG carriers, metocean studies, and geotechnical investigation. The study included conceptual design of the jetty, trestle, and unloading platform, along with capital cost estimation (±$450M) and construction scheduling. The project was delivered within budget and approved by all regulatory authorities.
